Tom nan Clach Wind Farm
Infinergy
Support Tom nan Clach Wind Farm
  • Home
  • News
  • Tom nan Clach
    • Cawdor Estate
  • Site Development
  • Environmental Impact
  • Interactive Map
  • Benefits
  • Kids
  • Your Concerns Addressed
  • About us
  • Links
  • Contact

You are not logged in.
Please register or login below



Tom nan Clach

The project has been named Tom nan Clach Wind Farm due to the location of the proposed site being situated close to the Tom nan Clach hill on Cawdor Estate, Nairnshire. It is a joint venture between Infinergy and Cawdor Estate.

The proposed development will consist of the following:

  • 17 turbines in total
  • Each turbine will be 110 metres to blade tip
  • Each turbine is likely to have a hub height between 60 metres and 75 metres
  • Each turbine will have an installed generating capacity of 2.3 MW (megawatts)
  • The total installed generating capacity of the wind farm will be 39.1MW
  • The proposed wind farm would provide clean electricity to meet the annual demands of up to 21,800 homes annually*

*Source: BWEA, 30% capacity factor and based on an average annual domestic electricity consumption of 4700 kWh (kilowatt hours). Formula is considered industry standard.

Powered by Open Debate from Consense
Winners 2011