Tom nan Clach Wind Farm
Infinergy
Support Tom nan Clach Wind Farm
  • Home
  • News
    • Downloads
  • Tom nan Clach
  • Site Development
  • Environmental Impact
  • Interactive Map
  • Benefits
  • Kids
  • Your Concerns Addressed
  • About us
  • Links
  • Contact

You are not logged in.
Please register or login below



Downloads

Planning Application Documents

Below you may look at the planning application for Tom nan Clach, plus the accompanying documents as submitted to The Highland Coucil

  • Planning Application Documentation
    • Mineral Workings Questionnaire (441.11 KB)
    • Letter of Application
      • Letter of Application (66.29 KB)
    • Planning Application Forms
      • Planning Application Forms (1.09 MB)
      • Mineral Workings Questionnaire (441.11 KB)
    • Planning Application Drawings
      • 01 - Location Plan (1.88 MB)
      • 02 - Site Layout (1.86 MB)
      • 03 - Turbine Elevations & Detail (252.2 KB)
      • 04 - Metmast Elevations & Detail (1.2 MB)
      • 05 - Neighbour Notification Plan (3.34 MB)
      • 06 - Inventory of Watercorse Crossings (1.12 MB)
      • 07 - Central Borrow Pit Development Plan (110.79 KB)
      • 08 - Bottomless Box Culvert Details (315.74 KB)
      • 09 - Restoration Plan (113.18 KB)
      • 10 - Eastern Borrow Pit Development Plan (34.82 KB)
      • 11 - Eastern Borrow Pit Cross Sections (27.88 KB)
      • 12 - Eastern Borrow Pit Restoration Plan (27.88 KB)
      • 13 - Construction Compound 1 Layout (182.16 KB)
      • 14 - Construction Compound 2 Layout (222.14 KB)
      • 15 - Turbine Foundations (406.27 KB)
      • 16 - Turning Head Type 1 (163.96 KB)
      • 17 - Turning Head Type 2 (167.72 KB)
      • 18 - Bridge at Major River Crossing (312.73 KB)
      • 19 - Central Borrow Pit Cross Sections (26.35 KB)
      • 20 - Hardstanding Detail (176.26 KB)
      • 21 - Passing Place Detail (127.13 KB)
      • 22 - Floating Track Design (273.55 KB)
      • 23 - Rockfill Track Design (286.7 KB)
      • 24 - Upgraded Track Design (227.13 KB)
      • 25 - Terraced Track Design (269.62 KB)
      • 26 - Excavated Track Design (262.26 KB)
      • 27 - Junction Layout (169.05 KB)
      • 28 - Substation (327.35 KB)
  • Environmental Statement Documents
    • Environmental Statement Non Technical Summary
      • Non Technical Summary (1.49 MB)
    • Environmental Statement Written Statement
      • Chapter 1 - Introduction
        • Introduction (28.42 KB)
        • Figure 1.1: Site Location (4.94 MB)
      • Chapter 2 - Policy Context
        • Policy Context (95.87 KB)
        • Fig 2.1: Highland Structure Plan Spatial Strategy (935.98 KB)
        • Fig 2.2: Highland Structure Plan Key Diagram (1.66 MB)
      • Chapter 3 - The Site and Surroundings
        • Site and Surroundings (27.3 KB)
        • Fig 3.1: Site Context (1021.7 KB)
        • Fig 3.2: Site in Detail (567.72 KB)
      • Chapter 4 - Alternatives and Scheme Evolution
        • Alternatives and Scheme Evolution (102.43 KB)
        • Fig 4.1: Alternative Transport Routes (5.67 MB)
        • Fig 4.2: Alternative Access Track Options (3.75 MB)
        • Fig 4.3: Zone of Theoretical Visibility - Access Track Options from B9007 (995.73 KB)
        • Fig 4.4: Turbine Layout Two (1.16 MB)
        • Fig 4.5: Turbine Layout Three (1.15 MB)
        • Fig 4.6: Turbine Layout Four (1.15 MB)
        • Fig 4.7: Turbine Layout Five (1.15 MB)
        • Fig 4.8: Final Turbine Layout (1.15 MB)
        • Fig 4.9: Zone of Theoretical Visibility - Comparison of Layout one & Final Turbine Layout (931.68 KB)
        • Fig 4.10a: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 8 (1000.12 KB)
        • Fig 4.10b: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 8 (989.08 KB)
        • Fig 4.11a: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 14 (1.3 MB)
        • Fig 4.11b: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 14 (1.28 MB)
        • Fig 4.12a: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 16 (967.99 KB)
        • Fig 4.12b: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 16 (981.79 KB)
        • Fig 4.13: Environmental Constraints (2.14 MB)
        • Fig 4.14: Site Steepness (1.47 MB)
        • Fig 4.14b: Wireline Diagrams of Turbine Layout Iterations from Viewpoint 14 (1.28 MB)
        • Fig 4.15: Habitat Constraints (4.89 MB)
      • Chapter 5 - Scheme Description
        • Scheme Description (86.22 KB)
        • Fig 5.1: Overall Wind Farm Layout (2.95 MB)
        • Fig 5.2: Assessment Wind Turbine (658.13 KB)
        • Fig 5.3: Standard Turbine Foundaion (391.57 KB)
        • Fig 5.4.: High Groundwater Foundation (385.21 KB)
        • Fig 5.5: Typical Turbine Hard Standing (299.94 KB)
        • Fig 5.6: Turbine Hard Standing with Turbine Area, Variant One (351.2 KB)
        • Fig 5.7: Turbine Hard Standing with Turbine Area, Variant Two (369.89 KB)
        • Fig 5.8: Access Track Junction (614.26 KB)
        • Fig 5.9: Passing Place (225.43 KB)
        • Fig 5.10: Excavated Track (374.67 KB)
        • Fig 5.11: Rockfill Track (1.58 MB)
        • Fig 5.12: Terraced Track (916.94 KB)
        • Fig 5.13: Floating Track (784.81 KB)
        • Fig 5.14: Existing Track Updating (Cross Section) (675.5 KB)
        • Fig 5.15: Bridge Watercourse Crossing (567.32 KB)
        • Fig 5.16: Bottomless Box Culvert (1021.69 KB)
        • Fig 5.17: Open Bottom Arched Culvert (545.05 KB)
        • Fig 5.18: Central Borrow Pit, Existing Topography Plan (1009.83 KB)
        • Fig 5.19: Central Borrow Pit, Development Plan (976.62 KB)
        • Fig 5.20: Central Borrow Pit, Restoration Plan (1020.73 KB)
        • Fig 5.21: Central Borrow Pit, Cross Section (220.6 KB)
        • Fig 5.22: Central Borrow Pit, Site Photographs (1.38 MB)
        • Fig 5.23: Eastern Borrow Pit, Existing Topography Plan (525.69 KB)
        • Fig 5.24: Eastern Borrow Pit, Development Plan (568.08 KB)
        • Fig 5.25: Eastern Borrow Pit, Restoration Plan (632.44 KB)
        • Fi 5.26: Eastern Borrow Pit, Cross Sections (274.44 KB)
        • Fig 5.27: Eastern Borrow Pit, Site Photographs (781.66 KB)
        • Fig 5.28: Construction Compound One (121.56 KB)
        • Fig 5.29: Construction Compound Two (203.96 KB)
        • Fig 5.30: Substation and Control - Maintenance Building (2.09 MB)
        • Fig 5.31: Construction Programme (690.1 KB)
        • Fig 5.32: Operational Wind Farm Metmast (195.32 KB)
      • Chapter 6 - Scoping and Consultation
        • Scoping and Consultation (30.12 KB)
      • Chapter 7 - Landscape and Visual
        • Landscape and Visual (495.86 KB)
      • Chapter 8 - Ecology
        • Ecology (350.08 KB)
        • Ecology Impact Summary Table (40.92 KB)
        • Fig 8.1: Designated Nature Conservation Sites (3.26 MB)
        • Fig 8.2: Ecological Survey Areas (937.78 KB)
        • Fig 8.3: Habitat Survey and Target Notes, Wind Turbine Area (1.19 MB)
        • Fig 8.4: Habitat Survey & Target Notes, Main Access Track (836.32 KB)
        • Fig 8.5: NVC Plant Communities, Wind Turbine Area (1.52 MB)
        • Fig 8.6: Protected Species & Watercourse Target Notes, Wind Turbine Area (940.99 KB)
        • Fig 8.7: Protected Species Target Notes, Main Access Track (1.36 MB)
        • Fig 8.8: Electrofishing and Macroinvertebrate Survey Locations (825.95 KB)
      • Chapter 9 - Ornithology
        • Ornithology (361.11 KB)
        • Ornithology Chapter Impact Summary Table (35.67 KB)
        • Fig 9.1: Breeding Bird Survey Results, 2006 (937.21 KB)
        • Fig 9.2: Breeding Bird Survey Results, 2008 (940.24 KB)
        • Fig 9.3: Flight Activity Survey Effort, September-October 2005 (1.92 MB)
        • Fig 9.4: Flight Activity Survey Effort, April - July 2006 (2.16 MB)
        • Fig 9.5: Flight Activity Survey Effort, April-August 2008 (1.78 MB)
        • Fig 9.6: Flight Activity Survey Effort, September 2008-February 2009 (1.87 MB)
        • Fig 9.7: Flight Lines of Target Species (1.45 MB)
        • Fig 9.8: Flight Lines of Target Species (1.58 MB)
        • Fig 9.9: Flight Lines of Target Species (1.52 MB)
        • Fig 9.10: Flight Lines of Target Species (1.55 MB)
        • Fig 9.11: Summary Flight Lines for Target Species (1.93 MB)
      • Chapter 10 - Traffic and Access
        • Traffic & Access (100.07 KB)
        • Fig 10.1: Strategic Access Route (5.66 MB)
      • Chapter 11 - Hydrology and Ground Conditions
        • Hydrology Ground Conditions (357.82 KB)
        • Fig 11.1: Catchments (8.28 MB)
        • Fig 11.2: Access Track Watercourse Crossings (8.37 MB)
        • Fig 11.10: Water Quality Monitoring Locations (8.21 MB)
        • Fig 11.12: Solid Geology (3.98 MB)
        • Fig 11.13: Drift Geology (14.3 MB)
        • Fig 11.14: Peat Depth, Wind Turbine Area (5.25 MB)
        • Fig 11.15: Peat Depth, Access Track (8.05 MB)
        • Fig 11.16: Basal Slope, Wind Turbine Area (5.13 MB)
        • Fig 11.17: Surface Slope, Wind Turbine Area (6.99 MB)
        • Fig 11.18: Peat Slide Risk Zoning Plan (5.74 MB)
        • Fig 11.19: Watercourse Buffer (5.97 MB)
      • Chapter 12 - Archaeology and Cultural Heritage
        • Archaeology and Cultural Heritage (61.59 KB)
        • Fig 12.1: Scheduled Ancient Monuments (3.56 MB)
        • Fig 12.2: Archaeological Features (3.63 MB)
      • Chapter 13 - Noise
        • Noise (84.23 KB)
        • Fig 13.1: Noise Measurement & Assessment Locations (3.02 MB)
        • Fig 13.2: Noise Contour Plot (2.2 MB)
        • Fig 13.3: Ballachrochin - Predicted Noise & Background Noise v Wind Speed (738.66 KB)
        • Fig 13.4: Ballachrochin - Predicted Noise and Background Noise v Wind Speed (668.64 KB)
      • Chapter 14 - Aviation
        • Aviation (71.48 KB)
        • Fig 14.1: Nearest Airfields and Low Fly Zones (1.03 MB)
        • Fig 14.2: Line of Sight Analysis: RAF Buchan (7.92 MB)
        • Fig 14.3: Line of Sight Analysis: RAF Lossiemouth (6.91 MB)
      • Chapter 15 - Telecommunications
        • Telecommunications (45.63 KB)
      • Chapter 16 - Air Quality and Climate
        • Air Quality and Climate (75.1 KB)
      • Chapter 17 - Socio-Economics
        • Fig 17.1: ZTV and Tourist Facilities (2.81 MB)
        • Fig 17.2: Tourist Routes (2.47 MB)
        • Socio-Economics (198.94 KB)
      • Chapter 18 - Shadow Flicker
        • Shadow Flicker (14.63 KB)
      • Chapter 19 - Conclusions
        • Conclusions (28.39 KB)
        • Conclusions Table (27.71 KB)
    • Enviornmental Statement Appendices
      • Contents
        • Contents (11.2 KB)
      • Chapter 4 - Alternatives & Scheme Evolution
        • Appendix 4.1 (84.32 KB)
      • Chapter 5 - Scheme Description
        • Appendix 5.1 (416.5 KB)
        • Appendix 5.2 (64.06 KB)
        • Appendix 5.3 (1.12 MB)
      • Chapter 6 - Scoping and Consultation
        • Appendix 6.1 (1.14 MB)
        • Appendix 6.2 (13.36 MB)
        • Appendix 6.3 (4.62 MB)
      • Chapter 7 - Landscape and Visual
        • Appendix 7.1 (9.83 KB)
      • Chapter 8 - Ecology
        • Appendix 8.1 (88.89 KB)
        • Appendix 8.2 (17.42 KB)
        • Appendix 8.3 (94.6 KB)
        • Appendix 8.4 (519.7 KB)
        • Appendix 8.5 (101.53 KB)
        • Appendix 8.6 (82.65 KB)
        • Appendix 8.7 (94 KB)
        • Appendix 8.8 (70.04 KB)
        • Appendix 8.9 (15.45 KB)
      • Chapter 9 - Ornithology
        • Appendix 9.1 (42.21 KB)
        • Appendix 9.2 (59.45 KB)
        • Appendix 9.3 (25.54 KB)
        • Appendix 9.4 (120.86 KB)
        • Appendix 9.5 (46.27 KB)
        • Appendix 9.6 (34.08 KB)
        • Appendix 9.7 (356.91 KB)
      • Chapter 10 - Traffic & Access
        • Appendix 10.1 (3.7 MB)
        • Appendix 10.2 (899.46 KB)
      • Chapter 11 - Hydrology & Ground Conditions
        • Appendix 11.1 (309.01 KB)
        • Appendix 11.2 (133.55 KB)
      • Chapter 12 - Archaeology & Cultural Heritage
        • Appendix 12.1 (78.2 KB)
      • Chapter 14 - Aviation
        • Appendix 14.1 (4.24 MB)
        • Appendix 14.2 (1.49 MB)
      • Chapter 15 - Telecommunications
        • Appendix 15.1 (6.63 MB)
      • Chapter 17 - Socio-Economics
        • Appendix 17.1 (129.49 KB)
    • Environmental Statement Landscape and Visuals
      • Figures 7.1-7.7
        • Fig 7.1: Site Location (769.37 KB)
        • Fig 7.2: Landscape Designations (823.95 KB)
        • Fig 7.3: Areas & Routes of Recognised Landscape Value (619.44 KB)
        • Fig 7.4: Landscape Character Types (3.49 MB)
        • Fig 7.6: Overlayof Landscape Character Types & ZTV to Blade Tip (541.15 KB)
        • Fig 7.7: ZTV to Nacelle with Viewpoint Locations (526.8 KB)
      • Photomontages 7.8-7.33
        • Fig 7.8: Balvraid Lodge Existing Conditions (371.85 KB)
        • Fig 7.9: Balvraid Lodge, Photowireline & Wireline (1.81 MB)
        • Fig 7.10: Carn Glas-choire Existing Conditions (334.77 KB)
        • Fig 7.11: Carn Glas-choire, Photomontage & Wireline (4.67 MB)
        • Fig 7.12: Ptarmigan Lodge Existing Conditions (323.91 KB)
        • Fig 7.13: Ptarmigan Lodge, Photowireline & Wireline (2.32 MB)
        • Fig 7.14: Carn Eachie Existing Conditions (378.23 KB)
        • Fig 7.15: Carn Eachie, Photowireline & Wireline (2.69 MB)
        • Fig 7.16: Minor Road North of Drynachan (371.89 KB)
        • Fig 7.17: Minor Road North of Drynachan, Photowireline & Wireline (2.32 MB)
        • Fig 7.18: B9007 Near Lochindorb (469.16 KB)
        • Fig 7.19: B9007 near Lochindorb, Photowireline & Photomontage (5.79 MB)
        • Fig 7.20: Carn an Fhreiceadain Existing Conditions (302.37 KB)
        • Fig 7.21: Carn an Fhreiceadain, Photowireline & Wireline (2.15 MB)
        • Fig 7.22: Dalmagarry Existing Conditions (478.33 KB)
        • Fig. 7.23: Dalmagarry, Photomontage & Wireline (4.78 MB)
        • Fig. 7.24: Meall a'Bhuachaille Existing Conditions (274.21 KB)
        • Fig. 7.25: Meall a'Bhuachaille, Photowireline & Wireline (1.84 MB)
        • Fig. 7.26: A9 River Findhorn Bridge Existing Conditions (449.27 KB)
        • Fig.7.27: A9 River Findhorn Bridge, Photomontage & Wireline (5.8 MB)
        • Fig. 7.28: Blackford near Dochgarroch Existing Conditions (469.31 KB)
        • Fig. 7.29: Blackfold near Dochgarroch, Photowireline & Wireline (2.18 MB)
        • Fig. 7.30: Gorton Hill Existing Conditions (351.67 KB)
        • Fig. 7.31: GortonHill Photomontage & Wireline (5.3 MB)
        • Fig. 7.32: A939 at Milestone Existing Conditions (444.75 KB)
        • Fig. 7.33: A939 at Milestone Photomontage & Wireline (4.7 MB)
      • Cumulative ZTV 7.34-7.46
        • Fig. 7.34: Sequetial Assessment (476.2 KB)
        • Fig. 7.35: Overlay of ZTV to Tip Height & Long Distance Path/Cycle Ways (1.19 MB)
        • Fig.7.36: Overlay of Statutory Landscape Designations & ZTV to Blade Tip (595.05 KB)
        • Fig.7.37: Wind Farms within 60kms (471.91 KB)
        • Fig.7.38: Cumulative ZTV - Tom nan Clach with Findhorn (503.71 KB)
        • Fig.7.39: Cumulative ZTV - Tom nan Clach with Rothes (511.58 KB)
        • Fig.7.40: Cumulative ZTV - Tom nan Clach with Paul's Hill (526.01 KB)
        • Fig.7.41: Cumulative ZTV - Tom nan Clach with Farr (525.79 KB)
        • Fig.7.42: Cumulative ZTV - Tom nan Clach with Existing/Consented Wind Farms (551.56 KB)
        • Fig.7.43: Cumulative ZTV - Tom nan Clach with Glenkirk (549.39 KB)
        • Fig.7.44: Cumulative ZTV - Tom nan Clach with Existing/Consented/Propsed Wind Farms (689.75 KB)
        • Fig.7.45: Cumulative ZTV - Tom nan Clach with Existing/Consented Wind Farms (558.69 KB)
        • Fig.7.46: Cumulative ZTV - Tom nan Clach with Existing/Consented/Proposed Wind Farms (614.36 KB)
      • Cumulative Wirelines 7.47-7.59
        • Fig.7.47: Balvrai Lodge Cumulative Wireline (678.83 KB)
        • Fig.7.48A: Carn Glas-choire (1.72 MB)
        • Fig.7.48B: Carn Glas-choire Cumulative Wireline 2 (1.7 MB)
        • Fig.7.49: Ptarmigan Lodge Cumulative Wireline (607.33 KB)
        • Fig.7.50: Carn Eachie Cumulative Wireline (1.81 MB)
        • Fig.7.51: Minor Road North of Drynachan Cumulative Wireline (1.37 MB)
        • Fig.7.52: B9007 near Lochindorb Cumulative Wireline (1.27 MB)
        • Fig.7.53: Carn an Fhreiceadain Cumulative Wireline (1.54 MB)
        • Fig.7.54: A9 Dalmagarry Cumulative Wireline (1.68 MB)
        • Fig.7.55: Meall a'Bhuachaille Cumulative Wireline (1.93 MB)
        • Fig.7.56: A9 River Findhorn Bridge Cumulative Wireline (1.8 MB)
        • Fig.5.57: Blackfold near Dochgarroch Cumulative Wireline (2 MB)
        • Fig.5.58: Gorton Hill Cumulative Wireline (1.98 MB)
        • Fig.5.59: A939 at Milestone Cumulative Wireline (1.6 MB)
      • Miscellaneous 7.60-7.61
        • Fig.7.60: Infrastucture Wireline (1.23 MB)
        • Fig.7.61: Infrastructure Wireline (1.62 MB)
    • Environmental Statement Addendum
      • Addendum August 2009 (4.23 MB)
      • Addendum November 2009 (6.37 MB)
      • Addendum April 2010 (3.8 MB)
  • Supporting Documents
    • Planning Statement
      • Planning Statement (119.71 KB)
    • Statement of Community Consultation
      • Statement of Community Consultation (278.68 KB)
      • Appendices 1 - 3 (1.17 MB)
      • Appendix 4 (1012.77 KB)
      • Appendices 5 - 14 (1.34 MB)
      • Appendices 15 - 16 (1.82 MB)
    • Visualisations Booklet June 2009
      • Visualisations Booklet (2.54 MB)
    • Visualisations Booklet December 2009
      • Viewpoint 4 - Carn Glas-choire (1.6 MB)
      • Viewpoint 8 - B9007 near Lochindorb (1.56 MB)
      • Viewpoint 11 - A9 near Dalmagarry (2.2 MB)
      • Viewpoint 16 - A9 River Findhorn Bridge (2.07 MB)
      • Viewpoint 22 - A939 at Milestone (1.77 MB)
      • Viewpoint 23 - Shoreline Lochindorb (1.58 MB)
Powered by Open Debate from Consense
Winners 2011